Londonwide Projects
Sort by: Name | Due completion | Importance | Status | Last update
Due: 2013
Last updated: 14 October 2004
|
Air conditioning will be introduced on the sub-surface lines, with a novel air-cooling system to be trialled on the deep tube lines.
[more...] |
Importance: Low
Status: Proposed
Mode: Tube
Areas: A |
Due: unknown date
Last updated: 6 January 2005
|
In addition to Crossrail 1 & 2, a third line has been mooted between Euston & Waterloo.
[more...] |
Importance: Average
Status: Proposed
Mode: Rail
Areas: A,C,N,SW,NW |
Due: 2009
Last updated: 8 February 2005
|
A 900km network of cycle routes with measures to give cyclists priority and/or safety is being realised across London.
[more...] |
Importance: Average
Status: Under construction
Mode: Other
Areas: A |
Due: 2016
Last updated: 10 June 2005
|
The majority of remaining 3-lane sections of the M25 would be widened under a £1.6bn scheme proposed to start in 2006.
[more...] |
Importance: Average
Status: Being planned
Mode: Road
Areas: A,O |
Due: 2012
Last updated: 25 January 2006
|
A variety of service enhancements are proposed for the Olympics in London in 2012.
[more...] |
Importance: Major
Status: Approved
Mode: Other
Areas: A |
Due: 2007
Last updated: 21 March 2006
|
London Buses have successfully trialled 3 hydrogen fuel cell buses on central London's route RV1.
[more...] |
Importance: Low
Status: Under construction
Mode: Bus
Areas: A |
Due: 2007
Last updated: 8 May 2006
|
Underground services will run 30 minutes later on Fridays and Saturdays, but will start an hour later on Saturday mornings from late May 2007
[more...] |
Importance: Average
Status: Proposed
Mode: Tube
Areas: A |
Due: 2016
Last updated: 1 August 2006
|
Complementary to Crossrail 1, this is a mainline tunnel from Clapham Junction via Victoria, Tottenham Ct Rd & King's Cross to undecided lines in the northeast.
[more...] |
Importance: High
Status: Being planned
Mode: Rail
Areas: A,C,N,E,SW |
Due: unknown date
Last updated: 7 September 2006
|
TfL wishes to take administrative control of London surburban services in order to specify higher standards and develop a fully integrated transport system.
[more...] |
Importance: High
Status: Proposed
Mode: Rail
Areas: A,O |
Due: 2019
Last updated: 8 September 2006
|
Metronet, the private infrastructure company in charge of the Bakerloo, Central, Victoria and Waterloo & City lines, has pledged various upgrades.
[more...] |
Importance: High
Status: Under construction
Mode: Tube
Areas: A,O,C,N,E,SW,W,NW |
Due: unknown date
Last updated: 12 February 2008
|
TfL will take over and improve several North London railway lines including the North London Line to create a "London Overground" franchise, eventually providing a range of orbital railway services through inner London.
[more...] |
Importance: Major
Status: Under construction
Mode: Rail
Areas: A,N,E,SE,SW,W,NW |
Due: unknown date
Last updated: 12 February 2008
|
Tube Lines, the private consortium in charge of maintaining these lines, has promised a series of upgrades.
[more...] |
Importance: High
Status: Under construction
Mode: Tube
Areas: A,C,N,E,SE,SW,W,NW |
Due: unknown date
Last updated: 12 February 2008
|
£3.1bn will be spent on new trains and signalling for the Circle, District, Metropolitan and Hammersmith & City lines.
[more...] |
Importance: High
Status: Under construction
Mode: Tube
Areas: A,C,E,SW,W,NW |
Due: unknown date
Last updated: 12 February 2008
|
The existing Countdown system, which tracks buses and relays arrival information to bus stops, is being replaced with a GPS-based system called iBus.
[more...] |
Importance: Average
Status: Under construction
Mode: Bus
Areas: A |
Due: unknown date
Last updated: 12 February 2008
|
A Low Emission Zone means charging vehicles not meeting minimum emissions standards for entering Greater London.
[more...] |
Importance: Average
Status: Complete
Mode: Road
Areas: A |
|
list by mode
list by area
search
Hint: put exact phrases, like place names, in quotes (e.g. "King's Cross" construction)

Hosting the 2012 Olympic Games
|