Tube Projects
Sort by: Name | Due completion | Importance | Status | Last update
Due: 2010
Last updated: 9 November 2006
|
Connections from the East London Line onto the National Rail network at both ends using disused railway alignments will permit orbital services from Highbury to Clapham Junction, Crystal Palace and Croydon.
[more...] |
Importance: Major
Status: Under construction
Mode: Tube
Areas: N,E,SE,SW |
Due: 2012
Last updated: 25 January 2006
|
A controversial redevelopment is proposed to relieve pressure on this busy station which already sees Sunday crowd control closures.
[more...] |
Importance: High
Status: Scrapped
Mode: Tube
Areas: N,NW |
Due: 2008
Last updated: 6 February 2005
|
Congestion will be relieved at Covent Garden by opening up the James St frontage of the station building so that five new ticket barriers can be built.
[more...] |
Importance: High
Status: Awaiting consent
Mode: Tube
Areas: C |
Due: 2019
Last updated: 8 September 2006
|
Metronet, the private infrastructure company in charge of the Bakerloo, Central, Victoria and Waterloo & City lines, has pledged various upgrades.
[more...] |
Importance: High
Status: Under construction
Mode: Tube
Areas: A,O,C,N,E,SW,W,NW |
Due: unknown date
Last updated: 12 February 2008
|
Tube Lines, the private consortium in charge of maintaining these lines, has promised a series of upgrades.
[more...] |
Importance: High
Status: Under construction
Mode: Tube
Areas: A,C,N,E,SE,SW,W,NW |
Due: unknown date
Last updated: 12 February 2008
|
£3.1bn will be spent on new trains and signalling for the Circle, District, Metropolitan and Hammersmith & City lines.
[more...] |
Importance: High
Status: Under construction
Mode: Tube
Areas: A,C,E,SW,W,NW |
Due: 2010
Last updated: 29 August 2006
|
A minor connection between Croxley LU and the disused Croxley Green rail branch would allow Met trains into Watford High St and Junction.
[more...] |
Importance: Average
Status: Awaiting consent
Mode: Tube
Areas: O,NW |
Due: unknown date
Last updated: 9 January 2005
|
A Central Line station will provided at Park Royal for interchange with the Piccadilly line and to serve new developments.
[more...] |
Importance: Average
Status: Approved
Mode: Tube
Areas: W |
Due: 2006
Last updated: 28 January 2007
|
Wembley Park station has been enlarged in connection with the new Wembley Stadium which is due to open in 2007; improvements also took place at Wembley Central and Wembley Stadium stations.
[more...] |
Importance: Average
Status: Complete
Mode: Tube
Areas: NW |
Due: 2013
Last updated: 29 May 2006
|
Victoria Underground station will be rebuilt to accommodate greater passenger flows.
[more...] |
Importance: Average
Status: Approved
Mode: Tube
Areas: C |
Due: 2007
Last updated: 8 May 2006
|
Underground services will run 30 minutes later on Fridays and Saturdays, but will start an hour later on Saturday mornings from late May 2007
[more...] |
Importance: Average
Status: Proposed
Mode: Tube
Areas: A |
Due: unknown date
Last updated: 22 May 2005
|
The Jubilee Line extension was constructed to allow a branch from North Greenwich to serve Thamesmead.
[more...] |
Importance: Low
Status: Proposed
Mode: Tube
Areas: E,SE |
Due: unknown date
Last updated: 10 June 2005
|
A one-stop branch from Seven Sisters to Northumberland Park would be possible.
[more...] |
Importance: Low
Status: Proposed
Mode: Tube
Areas: N |
Due: 2013
Last updated: 14 October 2004
|
Air conditioning will be introduced on the sub-surface lines, with a novel air-cooling system to be trialled on the deep tube lines.
[more...] |
Importance: Low
Status: Proposed
Mode: Tube
Areas: A |
Due: unknown date
Last updated: 18 November 2006
|
A long-planned southern extension of the Bakerloo line could take it to Camberwell and beyond.
[more...] |
Importance: Low
Status: Proposed
Mode: Tube
Areas: SE |
|
list by mode
list by area
search
Hint: put exact phrases, like place names, in quotes (e.g. "King's Cross" construction)

Hosting the 2012 Olympic Games
|