Sort by: Name | Due completion | Importance | Status | Last update
Due: 2003
Last updated: 30 October 2005
|
Changes are planned for the world's largest congestion charging scheme, including a price increase, expansion and smart vehicle tagging.
[more...] |
Importance: High
Status: Complete
Mode: Road
Areas: C |
Due: 2004
Last updated: 13 August 2006
|
TfL is funding a trial commuter river service from Greenwich to Embankment via Canary Wharf and the City.
[more...] |
Importance: Low
Status: Complete
Mode: Other
Areas: C,E,SE |
Due: 2004
Last updated: 6 February 2005
|
Slip roads onto the roundabout at South Mimms have been widened from two to three lanes.
[more...] |
Importance: Low
Status: Complete
Mode: Road
Areas: O |
Due: 2004
Last updated: 20 February 2006
|
Chiltern Railways extended some platforms on its route to accomodate longer trains.
[more...] |
Importance: Minor
Status: Complete
Mode: Rail
Areas: O,NW |
Due: 2004
Last updated: 11 April 2005
|
A new bus station with an adjusted road layout around the Vauxhall Cross is now complete.
[more...] |
Importance: Low
Status: Complete
Mode: Bus
Areas: C,SW |
Due: 2005
Last updated: 27 February 2006
|
Two heritage routes are operating using historic Routemaster buses in central London.
[more...] |
Importance: Low
Status: Complete
Mode: Bus
Areas: C |
Due: 2005
Last updated: 21 June 2005
|
BAA is in a joint venture with First Great Western to provide local trains from Paddington to Heathrow stopping at suburban stations.
[more...] |
Importance: Average
Status: Complete
Mode: Rail
Areas: W |
Due: 2005
Last updated: 4 February 2006
|
A new £20m depot at Wembley has been built as part of Chiltern's franchise commitment and will house its expanding fleet.
[more...] |
Importance: Average
Status: Complete
Mode: Rail
Areas: NW |
Due: 2005
Last updated: 20 February 2006
|
Widening of the M25 between the M4 (J15) and the M3 (J12) (Heathrow section) to give it 6 lanes in each direction.
[more...] |
Importance: High
Status: Complete
Mode: Road
Areas: O,W |
Due: 2005
Last updated: 21 August 2006
|
Services from Stratford to Stansted Airport and to Hertford East began in December 2005.
[more...] |
Importance: Average
Status: Complete
Mode: Rail
Areas: O,N,E |
Due: 2005
Last updated: 11 January 2006
|
New branch from Canning Town to North Woolwich via the riverside, including Silvertown and City Airport.
[more...] |
Importance: Average
Status: Complete
Mode: DLR
Areas: E |
Due: 2005
Last updated: 16 December 2005
|
A new tram stop for the Centrale retail development in Croydon is now open.
[more...] |
Importance: Low
Status: Complete
Mode: Tram
Areas: SW |
Due: 2006
Last updated: 28 January 2007
|
Wembley Park station has been enlarged in connection with the new Wembley Stadium which is due to open in 2007; improvements also took place at Wembley Central and Wembley Stadium stations.
[more...] |
Importance: Average
Status: Complete
Mode: Tube
Areas: NW |
Due: 2006
Last updated: 28 January 2007
|
Bishop's Bridge, which carries the A4206 over the rail approach into Paddington and the Grand Union Canal's Paddington Arm, was replaced with a wider, stronger structure.
[more...] |
Importance: Low
Status: Complete
Mode: Road
Areas: C |
Due: 2006
Last updated: 28 January 2007
|
Arsenal FC have built a new stadium at Ashburton Grove, Highbury (the Emirates Stadium), requiring improvements to the public transport network surrounding it.
[more...] |
Importance: Average
Status: Complete
Mode: Other
Areas: |
Due: 2006
Last updated: 28 January 2007
|
A partnership between boroughs and transport authorities saw improvements to the ambience of Finsbury Park, including new ticketing and cycle-parking facilities.
[more...] |
Importance: Low
Status: Complete
Mode: Other
Areas: N |
Due: 2006
Last updated: 28 January 2007
|
Chiltern Railways built two extra platforms at London Marylebone to give a capacity increase, as part of their "Project Evergreen" upgrade plans.
[more...] |
Importance: Average
Status: Complete
Mode: Rail
Areas: C |
Due: 2007
Last updated: 25 July 2004
|
A pilot scheme to trial motorway lanes dedicated to cars with 2 or more occupants in the morning rush hour.
[more...] |
Importance: Average
Status: Proposed
Mode: Road
Areas: O |
Due: 2007
Last updated: 5 January 2005
|
Safety in the 108-year-old northbound Blackwall Tunnel will be improved during a proposed refurbishment, following completion of current southbound refurbishment
[more...] |
Importance: Low
Status: Under construction
Mode: Road
Areas: E,SE |
Due: 2007
Last updated: 28 January 2007
|
A TfL branding exercise on high-frequency suburban lines to encourage turn-up-and-go usage.
[more...] |
Importance: Low
Status: Under construction
Mode: Rail
Areas: SE,SW |
Due: 2007
Last updated: 24 August 2006
|
Ebbsfleet International is a new station a few miles outside the M25 in Kent, on the Channel Tunnel Rail Link, which will have a 15 min journey time to St Pancras.
[more...] |
Importance: Average
Status: Under construction
Mode: Rail
Areas: O |
Due: 2007
Last updated: 21 March 2006
|
London Buses have successfully trialled 3 hydrogen fuel cell buses on central London's route RV1.
[more...] |
Importance: Low
Status: Under construction
Mode: Bus
Areas: A |
Due: 2007
Last updated: 29 May 2006
|
Deptford station will be redeveloped as part of a mixed-use regeneration project.
[more...] |
Importance: Minor
Status: Approved
Mode: Rail
Areas: SE |
Due: 2007
Last updated: 28 October 2007
|
Extension of the congestion charge zone into Kensington & Chelsea to the west.
[more...] |
Importance: High
Status: Complete
Mode: Road
Areas: C,SW,W |
Due: 2007
Last updated: 28 January 2007
|
A new footbridge will link the redeveloped Leamouth peninsula to Canning Town station.
[more...] |
Importance: Low
Status: Approved
Mode: Other
Areas: E |
Due: 2007
Last updated: 8 May 2006
|
Underground services will run 30 minutes later on Fridays and Saturdays, but will start an hour later on Saturday mornings from late May 2007
[more...] |
Importance: Average
Status: Proposed
Mode: Tube
Areas: A |
Due: 2007
Last updated: 17 November 2006
|
A new DLR station will serve the Langdon Park estate between All Saints and Devons Road.
[more...] |
Importance: Low
Status: Under construction
Mode: DLR
Areas: E |
Due: 2007
Last updated: 20 February 2008
|
True high-speed link from the Channel Tunnel to new international station at St Pancras. Eurostar services now use the link, with high-speed domestic services to Kent due in 2009.
[more...] |
Importance: Major
Status: Complete
Mode: Rail
Areas: O,E,SE |
Due: 2008
Last updated: 6 February 2005
|
Congestion will be relieved at Covent Garden by opening up the James St frontage of the station building so that five new ticket barriers can be built.
[more...] |
Importance: High
Status: Awaiting consent
Mode: Tube
Areas: C |
Due: 2008
Last updated: 20 February 2008
|
A new airport terminal on the former sewage works at Perry Oaks, along with associated road junction on M25 and rail and Underground links.
[more...] |
Importance: Major
Status: Under construction
Mode: Other
Areas: W |
Due: 2009
Last updated: 18 November 2006
|
Redevelopment of Battersea Power Station will require transport enhancements, particularly to Battersea Park station.
[more...] |
Importance: Low
Status: Awaiting consent
Mode: Other
Areas: SW |
Due: 2009
Last updated: 8 February 2005
|
A 900km network of cycle routes with measures to give cyclists priority and/or safety is being realised across London.
[more...] |
Importance: Average
Status: Under construction
Mode: Other
Areas: A |
Due: 2009
Last updated: 30 October 2005
|
Exhibition Road will be redesigned as part of a £25m project to improve the ambience around the South Kensington institutions.
[more...] |
Importance: Low
Status: Proposed
Mode: Road
Areas: C |
Due: 2010
Last updated: 29 August 2006
|
A minor connection between Croxley LU and the disused Croxley Green rail branch would allow Met trains into Watford High St and Junction.
[more...] |
Importance: Average
Status: Awaiting consent
Mode: Tube
Areas: O,NW |
Due: 2010
Last updated: 29 May 2006
|
A large redevelopment of the 180ha former railway land site, centered on Stratford International station, would see various transport improvements put into place.
[more...] |
Importance: Average
Status: Being planned
Mode: Other
Areas: E |
Due: 2010
Last updated: 9 November 2006
|
Connections from the East London Line onto the National Rail network at both ends using disused railway alignments will permit orbital services from Highbury to Clapham Junction, Crystal Palace and Croydon.
[more...] |
Importance: Major
Status: Under construction
Mode: Tube
Areas: N,E,SE,SW |
Due: 2011
Last updated: 10 June 2005
|
The M1 will be widened to four lanes between the M25 (J6A) and Milton Keynes South (J13) in two stages, starting with the M25 to Luton (J10).
[more...] |
Importance: Average
Status: Approved
Mode: Road
Areas: O |
Due: 2011
Last updated: 11 January 2006
|
Chiltern Railways are proposing a redevelopment of West Hampstead, with new Chiltern & Metropolitan platforms and a direct mezzanine link between platforms.
[more...] |
Importance: Average
Status: Being planned
Mode: Rail
Areas: NW |
Due: 2011
Last updated: 21 March 2006
|
A new tunnel would connect Heathrow to the railway between Staines & Wraysbury, enabling local services to south west London, Surrey and Waterloo, and longer-distance services to Hampshire.
[more...] |
Importance: Average
Status: Proposed
Mode: Rail
Areas: SW,W |
Due: 2012
Last updated: 25 January 2006
|
A controversial redevelopment is proposed to relieve pressure on this busy station which already sees Sunday crowd control closures.
[more...] |
Importance: High
Status: Scrapped
Mode: Tube
Areas: N,NW |
Due: 2012
Last updated: 27 October 2005
|
The operators of Luton Airport have proposed an additional, full-length runway and two new terminals.
[more...] |
Importance: High
Status: Proposed
Mode: Other
Areas: O |
Due: 2012
Last updated: 25 January 2006
|
A variety of service enhancements are proposed for the Olympics in London in 2012.
[more...] |
Importance: Major
Status: Approved
Mode: Other
Areas: A |
Due: 2013
Last updated: 12 February 2008
|
A new bridge with 2 lanes in each direction for private vehicles, a cycle/footway and two public transport lanes, from Beckton across the Thames to Thamesmead.
[more...] |
Importance: High
Status: Awaiting consent
Mode: Road
Areas: E |
Due: 2013
Last updated: 14 October 2004
|
Air conditioning will be introduced on the sub-surface lines, with a novel air-cooling system to be trialled on the deep tube lines.
[more...] |
Importance: Low
Status: Proposed
Mode: Tube
Areas: A |
Due: 2013
Last updated: 7 August 2006
|
A fairly short spur would take Tramlink from Harrington Road and Birkbeck via Anerley to Crystal Palace station.
[more...] |
Importance: Average
Status: Being planned
Mode: Tram
Areas: SE |
Due: 2013
Last updated: 29 May 2006
|
Victoria Underground station will be rebuilt to accommodate greater passenger flows.
[more...] |
Importance: Average
Status: Approved
Mode: Tube
Areas: C |
Due: 2015
Last updated: 20 February 2008
|
A major (and severely delayed) upgrade to Thameslink, the north-south rail link through London. More destinations will be served and there will be a higher frequency.
[more...] |
Importance: Major
Status: Under construction
Mode: Rail
Areas: O,C,N,SE,SW |
Due: 2015
Last updated: 14 June 2005
|
The DfT is investigating a satellite-based scheme which charges motorists based on the time of day they drive and the roads they drive on.
[more...] |
Importance: High
Status: Proposed
Mode: Road
Areas: UK |
Due: 2016
Last updated: 10 June 2005
|
The majority of remaining 3-lane sections of the M25 would be widened under a £1.6bn scheme proposed to start in 2006.
[more...] |
Importance: Average
Status: Being planned
Mode: Road
Areas: A,O |
Due: 2016
Last updated: 20 February 2005
|
A TGV-style line would take advantage of Britain's linear geography by connecting major cities between London and Edinburgh/Glasgow with 220mph lines.
[more...] |
Importance: High
Status: Proposed
Mode: Rail
Areas: UK |
Due: 2016
Last updated: 1 August 2006
|
Complementary to Crossrail 1, this is a mainline tunnel from Clapham Junction via Victoria, Tottenham Ct Rd & King's Cross to undecided lines in the northeast.
[more...] |
Importance: High
Status: Being planned
Mode: Rail
Areas: A,C,N,E,SW |
Due: 2016
Last updated: 12 November 2006
|
New tram running from Camden and King's Cross to Euston, Holborn, Waterloo, Elephant & Castle and then to both Peckham and Brixton.
[more...] |
Importance: Major
Status: Being planned
Mode: Tram
Areas: C,SE,SW,NW |
Due: 2017
Last updated: 20 February 2008
|
London's biggest project, Crossrail, is a new railway tunnel between Paddington & Whitechapel, enabling suburban trains to travel from Heathrow & Maidenhead to Canary Wharf, Shenfield & Abbey Wood.
[more...] |
Importance: Major
Status: Approved
Mode: Rail
Areas: O,C,E,SE,W |
Due: 2019
Last updated: 8 September 2006
|
Metronet, the private infrastructure company in charge of the Bakerloo, Central, Victoria and Waterloo & City lines, has pledged various upgrades.
[more...] |
Importance: High
Status: Under construction
Mode: Tube
Areas: A,O,C,N,E,SW,W,NW |
Due: 2020
Last updated: 27 October 2005
|
Despite construction of Terminal 5, further long-term growth at Heathrow would require extra runway capacity.
[more...] |
Importance: High
Status: Proposed
Mode: Other
Areas: W |
Due: 2021
Last updated: 18 November 2006
|
A river crossing is proposed from West Silvertown to North Greenwich, to supplement the Blackwall crossing.
[more...] |
Importance: Average
Status: Proposed
Mode: Road
Areas: E,SE |
Due: 2022
Last updated: 4 July 2006
|
Redevelopment of the area to the north and south of Staples Corner will result in a new town centre with a high quality bus corridor and new railway station.
[more...] |
Importance: Average
Status: Being planned
Mode: Other
Areas: NW |
Due: 2026
Last updated: 27 January 2007
|
Two new routes on the Croydon tram network are proposed; Sutton to Tooting via Mitcham and Sutton to Wimbledon via the current rail route.
[more...] |
Importance: Average
Status: Being planned
Mode: Tram
Areas: SW |
Due: 2026
Last updated: 18 November 2006
|
A north-south route from Purley via Croydon to Streatham is being considered for Tramlink.
[more...] |
Importance: Average
Status: Being planned
Mode: Tram
Areas: O,SE,SW |
Due: 2026
Last updated: 18 November 2006
|
An extremely early proposal for a DLR extension westwards from Bank (potentially to Charing Cross) has been floated.
[more...] |
Importance: High
Status: Proposed
Mode: DLR
Areas: C |
Due: unknown date
Last updated: 28 October 2007
|
The last single carriageway section of the main route between Woolwich and the M25 will be dualled.
[more...] |
Importance: Average
Status: Complete
Mode: Road
Areas: SE |
Due: unknown date
Last updated: 11 March 2006
|
Various bodies wish to see a new station built between Streatham and Mitcham Junction, to cover a "hole" served by no railway stations.
[more...] |
Importance: Low
Status: Proposed
Mode: Rail
Areas: SW |
Due: unknown date
Last updated: 9 July 2004
|
Islington Council & the LTUC propose a reinstated station on the Gospel Oak - Barking line, which passes very close to Tufnell Park Northern Line station.
[more...] |
Importance: Low
Status: Proposed
Mode: Rail
Areas: N |
Due: unknown date
Last updated: 22 May 2005
|
The Jubilee Line extension was constructed to allow a branch from North Greenwich to serve Thamesmead.
[more...] |
Importance: Low
Status: Proposed
Mode: Tube
Areas: E,SE |
Due: unknown date
Last updated: 6 January 2005
|
The rail users' group for the Barking - Gospel Oak line want to see Leyton (Bakers Arms) station on Lea Bridge Road reopened.
[more...] |
Importance: Low
Status: Proposed
Mode: Rail
Areas: E |
Due: unknown date
Last updated: 10 June 2005
|
This Highways Agency plan aims to improve the M4 - in London it is considering various strategies including extending the bus lane or tolls.
[more...] |
Importance: Low
Status: Proposed
Mode: Road
Areas: O,W |
Due: unknown date
Last updated: 12 February 2008
|
A Low Emission Zone means charging vehicles not meeting minimum emissions standards for entering Greater London.
[more...] |
Importance: Average
Status: Complete
Mode: Road
Areas: A |
Due: unknown date
Last updated: 6 January 2005
|
In addition to Crossrail 1 & 2, a third line has been mooted between Euston & Waterloo.
[more...] |
Importance: Average
Status: Proposed
Mode: Rail
Areas: A,C,N,SW,NW |
Due: unknown date
Last updated: 26 December 2004
|
Two new stations are proposed to serve riverside developments in Barking and Dagenham on the c2c line.
[more...] |
Importance: Low
Status: Proposed
Mode: Rail
Areas: E |
Due: unknown date
Last updated: 12 February 2008
|
An extension from Gallions Reach through the Barking Reach development site to Dagenham Dock station.
[more...] |
Importance: Average
Status: Being planned
Mode: DLR
Areas: E |
Due: unknown date
Last updated: 10 June 2005
|
A one-stop branch from Seven Sisters to Northumberland Park would be possible.
[more...] |
Importance: Low
Status: Proposed
Mode: Tube
Areas: N |
Due: unknown date
Last updated: 11 January 2006
|
Chelsea Village PLC want to build a station on the West London Line to serve Chelsea FC's football stadium at Stamford Bridge.
[more...] |
Importance: Minor
Status: Awaiting consent
Mode: Rail
Areas: W |
Due: unknown date
Last updated: 12 February 2008
|
Plans to grade-separate the remaining sections of the North Circular with flat junctions - Henlys Corner, Bounds Green & Golders Green Rd - have been dropped in favour of smaller improvement schemes.
[more...] |
Importance: High
Status: Being planned
Mode: Road
Areas: N |
Due: unknown date
Last updated: 7 January 2005
|
TfL are investigating proposals for a tram in the boroughs of Haringey and Enfield.
[more...] |
Importance: Low
Status: Proposed
Mode: Tram
Areas: N |
Due: unknown date
Last updated: 16 March 2007
|
When Eurostar move from Waterloo to St Pancras in 2007, the vacated International station will be used by SWT trains.
[more...] |
Importance: Average
Status: Proposed
Mode: Rail
Areas: O,C,SW |
Due: unknown date
Last updated: 25 February 2005
|
The South London Partnership lobbied for additional tram routes in South London including routes from Kingston to Sutton and the M25.
[more...] |
Importance: Low
Status: Scrapped
Mode: Tram
Areas: SW |
Due: unknown date
Last updated: 22 August 2007
|
Hackney's East London Line Group and the LTUC want to see interchange platforms provided on the Nunhead-Lewisham line at Brockley.
[more...] |
Importance: Low
Status: Proposed
Mode: Rail
Areas: SE |
Due: unknown date
Last updated: 9 January 2005
|
A Central Line station will provided at Park Royal for interchange with the Piccadilly line and to serve new developments.
[more...] |
Importance: Average
Status: Approved
Mode: Tube
Areas: W |
Due: unknown date
Last updated: 7 August 2006
|
This is a large office park development off Chiswick High Road; some small-scale transport improvements are planned.
[more...] |
Importance: Low
Status: Proposed
Mode: Other
Areas: W |
Due: unknown date
Last updated: 12 February 2008
|
The City Airport DLR branch will further be extended under the river to Woolwich Arsenal station.
[more...] |
Importance: Average
Status: Under construction
Mode: DLR
Areas: E,SE |
Due: unknown date
Last updated: 12 February 2008
|
A segregated high-quality bus route between Greenwich / North Greenwich, Thamesmead and Abbey Wood.
[more...] |
Importance: High
Status: Approved
Mode: Bus
Areas: SE |
Due: unknown date
Last updated: 18 November 2006
|
A long-planned southern extension of the Bakerloo line could take it to Camberwell and beyond.
[more...] |
Importance: Low
Status: Proposed
Mode: Tube
Areas: SE |
Due: unknown date
Last updated: 16 January 2005
|
The Corporation of London has proposed a tram scheme from the southwest via the City to Islington and Hackney.
[more...] |
Importance: Average
Status: Proposed
Mode: Tram
Areas: C,N,E,SW |
Due: unknown date
Last updated: 6 January 2005
|
The inner London areas of Camberwell and Walworth lost their rail service in 1916 and never got it back. Plans exist to rebuild two stations to serve them.
[more...] |
Importance: Low
Status: Proposed
Mode: Rail
Areas: SE |
Due: unknown date
Last updated: 19 June 2007
|
The existing single-platform Stratford DLR station is being rebuilt with two platforms.
[more...] |
Importance: Average
Status: Under construction
Mode: DLR
Areas: E |
Due: unknown date
Last updated: 11 January 2006
|
A station could be constructed on the North London Line at York Way, to serve the King's Cross railway land development. Interchange could be possible with the Tube by reopening the long-disused York Road Piccadilly Line station.
[more...] |
Importance: Low
Status: Proposed
Mode: Rail
Areas: N |
Due: unknown date
Last updated: 11 January 2006
|
A third entrance to Clapham Junction station, on St John's Hill, would relieve overcrowding and accommodate future growth if the East London Line arrives here.
[more...] |
Importance: Low
Status: Proposed
Mode: Rail
Areas: SW |
Due: unknown date
Last updated: 7 January 2005
|
A new pedestrian route will link nearby Central and Queen's Road stations in Walthamstow.
[more...] |
Importance: Minor
Status: Approved
Mode: Other
Areas: E |
Due: unknown date
Last updated: 7 January 2005
|
An additional entrance at West Croydon station could improve interchange to tram and bus services.
[more...] |
Importance: Minor
Status: Proposed
Mode: Rail
Areas: SE,SW |
Due: unknown date
Last updated: 7 January 2005
|
A cycle and footbridge has been proposed across the Thames from Chelsea Harbour to Battersea, adjacent to the West London Line rail bridge.
[more...] |
Importance: Minor
Status: Proposed
Mode: Other
Areas: SW |
Due: unknown date
Last updated: 28 January 2007
|
Kensington & Chelsea are consulting on a redesign of Sloane Square to provide more pedestrian space.
[more...] |
Importance: Low
Status: Awaiting consent
Mode: Road
Areas: C |
Due: unknown date
Last updated: 20 February 2005
|
Congestion charging is being considered at Heathrow to raise money for public transport improvements and reduce emissions.
[more...] |
Importance: Low
Status: Proposed
Mode: Road
Areas: W |
Due: unknown date
Last updated: 13 May 2005
|
New canal facilities will be constructed in north and west London along with improvement of existing facilities through dredging, in order to aid freight transport.
[more...] |
Importance: Low
Status: Approved
Mode: Other
Areas: N,W,NW |
Due: unknown date
Last updated: 28 October 2007
|
Developers St George will provide a new station on the West London Line at Chelsea Harbour as part of their Imperial Wharf development
[more...] |
Importance: High
Status: Approved
Mode: Rail
Areas: SW |
Due: unknown date
Last updated: 6 March 2006
|
This proposal envisages new rail services from Dartford via Sidcup, Lewisham and Peckham to Clapham Junction.
[more...] |
Importance: Low
Status: Proposed
Mode: Rail
Areas: SE,SW |
Due: unknown date
Last updated: 12 February 2008
|
To serve the new international station at Stratford, the DLR would take over North London Line services between Canning Town and Stratford.
[more...] |
Importance: Average
Status: Approved
Mode: DLR
Areas: E |
Due: unknown date
Last updated: 4 April 2006
|
New stations are proposed for Thameslink to serve new developments at Napsbury (London Colney), Luton North, Elstow (south Bedford) and Bedford North.
[more...] |
Importance: Low
Status: Proposed
Mode: Rail
Areas: O |
Due: unknown date
Last updated: 27 October 2005
|
A multimodal river crossing between Canvey Island, Essex and the Medway Towns, Kent has been proposed by various groups.
[more...] |
Importance: Average
Status: Proposed
Mode: Other
Areas: O |
Due: unknown date
Last updated: 7 June 2007
|
Both the government and BAA have proposed a new runway and terminal at Stansted to increase capacity at London airports.
[more...] |
Importance: High
Status: Proposed
Mode: Rail
Areas: O |
Due: unknown date
Last updated: 12 February 2008
|
Tube Lines, the private consortium in charge of maintaining these lines, has promised a series of upgrades.
[more...] |
Importance: High
Status: Under construction
Mode: Tube
Areas: A,C,N,E,SE,SW,W,NW |
Due: unknown date
Last updated: 6 November 2005
|
Heathrow operators BAA want to introduce a personal rapid transit system to link car parks to terminals.
[more...] |
Importance: Low
Status: Proposed
Mode: Other
Areas: W |
Due: unknown date
Last updated: 28 October 2007
|
A tram running along the Uxbridge Road between Uxbridge and Shepherd's Bush.
[more...] |
Importance: High
Status: Scrapped
Mode: Tram
Areas: W |
Due: unknown date
Last updated: 9 July 2006
|
A £1bn improvement and enlargement of Euston mainline station is planned, including Underground improvements.
[more...] |
Importance: Average
Status: Being planned
Mode: Rail
Areas: C |
Due: unknown date
Last updated: 12 February 2008
|
The Bank to Lewisham route will be upgraded to take 3-unit trains instead of the current 2-unit trains, involving viaduct strengthening and platform extensions. A similar upgrade for the Stratford & Beckton routes will follow.
[more...] |
Importance: Average
Status: Approved
Mode: DLR
Areas: E,SE |
Due: unknown date
Last updated: 23 March 2006
|
Improvements are being investigated by TfL Rail to the interchange between Hackney Downs and Hackney Central stations.
[more...] |
Importance: Minor
Status: Proposed
Mode: Rail
Areas: N,E |
Due: unknown date
Last updated: 12 February 2008
|
A segregated high-quality bus scheme is proposed for the eastern centres of Barking and Romford.
[more...] |
Importance: High
Status: Approved
Mode: Bus
Areas: E |
Due: unknown date
Last updated: 13 August 2006
|
A long-standing idea would see all vehicles removed from Oxford St except for trams.
[more...] |
Importance: Low
Status: Proposed
Mode: Other
Areas: C |
Due: unknown date
Last updated: 7 September 2006
|
TfL wishes to take administrative control of London surburban services in order to specify higher standards and develop a fully integrated transport system.
[more...] |
Importance: High
Status: Proposed
Mode: Rail
Areas: A,O |
Due: unknown date
Last updated: 12 February 2008
|
TfL will take over and improve several North London railway lines including the North London Line to create a "London Overground" franchise, eventually providing a range of orbital railway services through inner London.
[more...] |
Importance: Major
Status: Under construction
Mode: Rail
Areas: A,N,E,SE,SW,W,NW |
Due: unknown date
Last updated: 12 February 2008
|
The congestion charge will be waived for the cleanest vehicles and raised to £25 per day for the most polluting, including those owned by charge zone residents.
[more...] |
Importance: Low
Status: Under construction
Mode: Road
Areas: C |
Due: unknown date
Last updated: 28 October 2007
|
DLR are carrying out a feasibility study on a southward extension from Lewisham to Catford.
[more...] |
Importance: Average
Status: Proposed
Mode: DLR
Areas: SE |
Due: unknown date
Last updated: 12 February 2008
|
A new development at White City will include a new Tube station, a National Rail station for Shepherd's Bush, a bus station and associated improvements.
[more...] |
Importance: Average
Status: Approved
Mode: Other
Areas: W |
Due: unknown date
Last updated: 12 February 2008
|
The existing Countdown system, which tracks buses and relays arrival information to bus stops, is being replaced with a GPS-based system called iBus.
[more...] |
Importance: Average
Status: Under construction
Mode: Bus
Areas: A |
Due: unknown date
Last updated: 12 February 2008
|
£3.1bn will be spent on new trains and signalling for the Circle, District, Metropolitan and Hammersmith & City lines.
[more...] |
Importance: High
Status: Under construction
Mode: Tube
Areas: A,C,E,SW,W,NW |
Due: unknown date
Last updated: 28 October 2007
|
King's Cross tube station is undergoing reconstruction, the Thameslink station is being rebuilt and St Pancras is being upgraded as part of the CTRL project.
[more...] |
Importance: Major
Status: Under construction
Mode: Other
Areas: C |
|
list by mode
list by area
search
Hint: put exact phrases, like place names, in quotes (e.g. "King's Cross" construction)

Hosting the 2012 Olympic Games
|